
Construction
Construction Dumpster Rental in Greeley, CO
Containers for new builds, additions, remodels and site work across Greeley and Weld County. Greeley Municipal Code § 12-269(b) makes clearing construction and demolition debris an obligation on the property, not an option.
Greeley writes down what happens to construction debris, and it is worth reading before the first load. Greeley Municipal Code § 12-269(b) provides that “all refuse and debris remaining as a result of the demolition or repair of any buildings or the erection and completion of any buildings shall be removed following substantial completion of the work,” and § 12-269 as a whole makes an accumulation a code infraction. The refuse chapter adds, at § 8-371, that nothing in it relieves contractors of the duty to clean up their own work sites. That is not a general tidiness sentiment; it is a municipal obligation attached to the property. Inside the Greeley city limits this is a City question — Greeley 311, (970) 351-5311.
The codes you are building to are the City’s own, and they are worth naming because Colorado does not hand them down. There is no statewide building code in Colorado. Every jurisdiction adopts its own, separately, and the editions genuinely differ across a boundary you can walk over. Greeley adopted the 2021 International Building Code at § 22-31 and the 2021 International Residential Code at § 22-76, both effective 1 January 2023. The City’s own adopted Table R301.2(1) specifies a frost line depth of 30 inches, and § 22-49 sets a ground snow load of 30 pounds per square foot with a minimum roof snow load of 20 psf. Out on unincorporated county ground the Weld County Building Department at 1150 O Street, (970) 400-4000 is the authority, and it is on a different edition of the same I-Code family. Never assume the two match.
A thirty-inch frost line is the fact that quietly changes container sizing on a Greeley build. Footings, water services and sewer laterals all go at least thirty inches down, which means excavation here produces meaningfully more spoil than the same job in a warm-climate market, and it is why full basements are ordinary rather than exceptional. It also means that a large share of Greeley construction work is not new construction at all. With a median year built of 1985 and roughly 46 percent of the housing stock predating 1980, the recurring jobs here are sewer lateral replacement, foundation repair, basement finishing and whole-house renovation on houses that are sixty years old. Those produce a mixed stream — framing, drywall, old plumbing, plaster, dense spoil — and mixed streams are where sizing goes wrong most often.
Before anything goes in the ground, call Colorado 811. Colorado’s statute, C.R.S. § 9-1.5-103, requires notice two business days before excavation, not counting the day of the notice, and Colorado 811 itself advises allowing three. Markings are valid for up to thirty calendar days, and white-lining the dig area first is expected. The number is 811 or 800-922-1987. This matters more than it might sound on a Greeley remodel, because on an older lot the utilities are often not where the plans say they are, and because Weld County produces more than eighty percent of Colorado’s oil and gas — buried lines are part of the landscape here in a way they are not everywhere.
The container side is straightforward. On private property — the lot, the drive, the staging area — no Public Space permit is in play at all. If part of the container has to sit in the street or on a sidewalk, the City is explicit: “placement of dumpsters within the Public Space and roadways requires Public Space Traffic permits and proper signage,” and the desk is Public Works Permits, 970-350-9881, at 2835 W. 10th Street, Monday to Friday 7 a.m. to 4 p.m. Applications go through the City’s online portal. We are not going to publish a fee for it, because Greeley’s permit charges are set annually by the city manager under § 18-66 rather than fixed in the code — ask the desk what the figure is this year. Call the yard on (970) 888-6911 and we will match the box to the phase.
Construction Work We Set Containers For
New Residential Construction
Framing offcuts, sheathing, housewrap, window and door packaging, siding scrap and the general accumulation of a build. High volume, low density, and it comes in waves rather than evenly — which is an argument for scheduled swaps rather than one enormous box.
Additions And Second-Story Work
Demolition of the existing wall, roof cut-in, framing, drywall and the old material coming out of what used to be an exterior elevation. Mixed density, and on a pre-1978 Greeley house it needs the lead question settled before the sawzall comes out.
Whole-House Renovation
The commonest large job in this city, because roughly 46 percent of the housing predates 1980. Plaster, lath, cabinetry, flooring, old ductwork, knob-and-tube and sixty years of accumulated modification, all coming out over weeks rather than days.
Basement Finish-Out
Framing, drywall, subfloor, doors, trim and the old paneling that was there first. Dense material carried up a stair in a confined space, so the pace is steady and the container sits for a while rather than filling in an afternoon.
Sewer Lateral And Water Service Replacement
A thirty-inch frost line means the trench is deep and the spoil is heavy. Trench spoil goes in a small container loaded flat, never in a big one — a 30 full of dirt reaches lawful road payload while it still looks half empty.
Foundation Repair And Underpinning
Broken concrete, soil, form material and the demolition around access. This is a weight job in every direction and it belongs in a 10 or a 15, kept clean and kept separate from the mixed load.
Site Work And Lot Preparation
Cleared brush, old fencing, broken asphalt, demolished outbuildings and general site trash. Bulky and mixed, and the one phase where a 40 usually earns its keep on a residential site.
Roof, Window And Envelope Replacement
Tear-off, old windows, trim, flashing and insulation. Roofing runs heavy and belongs in a 15 or a 20; the rest of the envelope runs light and can share a larger box. See our roofing page for the tear-off arithmetic.
Sizing A Container For A Build
On a build the box follows the phase. Demolition and strip-out is mixed and dense, and a 20 yard or 30 yard loaded deliberately is usually right. Framing, sheathing and packaging is bulky and light, which is the condition a 40 yard exists for. Excavation spoil, broken concrete, masonry and tile in a mortar bed all reach lawful road weight long before they fill anything, so they go in a 10 or a 15, loaded flat across the whole floor. The single most useful habit on a Greeley site is to keep the heavy stream separate from the mixed one: a clean masonry or clean fill load has disposal routes that a contaminated one loses, and two right-sized containers routinely cost less than one that cannot lawfully be hauled. Our Weld County disposal guide works through where each stream goes.
20 Yard Dumpster
The box that leaves our yard most: a basement and a garage cleared in one fortnight.
View this size →30yd³30 Yard Dumpster
A whole-floor remodel, a lifetime of storage, or a May turnover. Shingle never rides in it.
View this size →40yd³40 Yard Dumpster
Bulk with no weight in it — and it wants more room to land than anything else we run.
View this size →Ground, Locates And The Fire Setback
Site placement here has four constraints worth planning around. Ground. A construction lot is soft ground by definition, and a loaded roll-off concentrates its weight at the wheels and the rear rollers — we want compacted base, a poured apron or plated timber under the box, and we would rather set it further from the work than sink it near the work. The Colorado Geological Survey maps a potentially swelling-clay corridor with Greeley at its northern end, and clays that expand when they get wet are a reason to keep heavy loads and standing water away from each other; we are not going to tell you what is under a particular address. Locates. Colorado 811 wants two business days by statute, three by its own advice, and the box should not be sitting over the dig or the marks. Fire clearance. Greeley adopted the 2021 International Fire Code at § 22-454 with no amendment to Section 304, so Section 304.3 applies as written: a dumpster must not be stored inside a building or placed within five feet of a combustible wall, and every roll-off is far over the threshold. On a framed structure that means five feet from the sheathing, not five feet from the finished elevation you have in your head. The same section requires lids on containers over forty gallons and puts oily rags in a listed disposal container, which is a genuine ignition risk on a site with stains and finishes on it. Greeley Fire Prevention: (970) 350-9510. Access. Sixty feet of straight run, eleven feet of width, twenty feet of overhead for the hoist, and an eye on the temporary power drop. A phasing note that saves money more often than any other piece of advice we give: book the heavy container for the week the heavy material is produced rather than keeping one large box for the whole program. Excavation, slab breakout and masonry demolition are usually a few days each on a Greeley build, and a small container in and out on those days costs far less than a large one running at payload for a month.
Landed on the wrong page? Describe the job down the phone and you will be pointed at the right container, even where that means a different service entirely. Ring (970) 888-6911.
Get one flat number
Two minutes on the phone buys a size, a figure and a slot on the board. Nothing to fill in.
(970) 888-6911Sizes that suit it
How it works
Construction Dumpster Rental in four steps
- 1
Tell us the job
Two minutes, and a cross street and an avenue is enough to place you on this grid. You hang up with a flat number that has the disposal inside it.
- 2
We set it down
The driver walks the approach first, puts mats under both rails, and keeps the box the five feet clear of combustible wall that Section 304.3 asks for.
- 3
Fill it flat and low
Use the days in your window. Heavy on the bottom, nothing standing proud of the rail, and tarped — wind is the risk here, not rain.
- 4
Say the word
Ring or text and we pull it. Metal, cardboard and electronics come out on the way, and the rest goes to a gate permitted to take it.
Construction Dumpster Rental FAQs
Which code is my Greeley job built to?
Inside the city limits, the City’s own. Greeley adopted the 2021 International Building Code at § 22-31 and the 2021 International Residential Code at § 22-76, both effective 1 January 2023, and it publishes its own design criteria within them — a 30-inch frost line in Table R301.2(1) and, at § 22-49, a 30 psf ground snow load with a 20 psf minimum roof snow load. The important structural point is that Colorado has no statewide building code: adoption is entirely local, and the jurisdiction next door may be on a different edition of the same code family. Out on unincorporated Weld County ground the Building Department at 1150 O Street, (970) 400-4000 is the authority, and its edition is not Greeley’s. Never assume one jurisdiction’s rules apply in another — ask the desk that will inspect the work.
Do I need a permit for the container itself?
Not on the lot. On private property there is no Public Space permit in play at all. It changes the moment part of the box has to stand in the roadway or on a sidewalk, and there Greeley names dumpsters directly: the City’s permitting guidance says “placement of dumpsters within the Public Space and roadways requires Public Space Traffic permits and proper signage.” The permit type is the Traffic Control Permit, defined as covering “work in public space without ground disturbance that impacts mobility” — which is exactly a container at a curb. Public Works Permits, 970-350-9881, 2835 W. 10th Street, Monday to Friday 7 a.m. to 4 p.m., applications through the City’s online portal. For a job on county ground, the right-of-way desk is at 1150 O Street, (970) 400-4000; the county’s language covers occupation and excavation within county rights-of-way but does not name dumpsters, so it is worth a call rather than an assumption.
How much notice does Colorado 811 need?
Two business days is the statutory figure — C.R.S. § 9-1.5-103 requires notice at least two business days before excavation, not counting the day the notice is given. Colorado 811 itself advises allowing three, and on a busy week in May that advice is worth taking. Markings stay valid for up to thirty calendar days, and you are expected to white-line the proposed dig area before the locate rather than describe it over the phone. The number is 811 or 800-922-1987. Two practical notes for Greeley: on an older lot the services are frequently not where the drawings show them, and a container should not be parked over the marks or the trench line, because the truck sets down with real force at the rollers.
What is the difference between a construction container and a demolition container?
Density and sequence rather than the box itself. A construction container takes a stream that is mostly bulky and light — framing offcuts, sheathing, packaging, insulation, trim — delivered over weeks, so the constraint is volume and the answer is often a 30 or a 40 swapped on a rhythm. A demolition container takes a stream that is dense and arrives all at once — plaster, lath, tile, masonry, old flooring — so the constraint is lawful road weight and the answer is a smaller box loaded flat, often two of them. On a Greeley renovation you usually have both phases in the same project, and the cheapest way through is to separate the streams rather than mix them into one over-loaded container.
What cannot go in a construction container?
Electronics — banned from Colorado landfills since 1 July 2013 under C.R.S. § 25-17-303. Tires, refused locally and routed to registered tire facilities. Then liquids, paint, solvents, adhesives, fuel, oil, pressurized tanks, batteries, hot ashes, and anything containing asbestos. That last one is the important one on a Greeley job, because so much of the housing stock is old enough to have it: CDPHE Regulation 8, Part B treats asbestos as an air quality matter, sets single-family trigger levels at 32 square feet, 50 linear feet, or a 55-gallon drum, requires ten working days’ notice for a regulated project and for any demolition, and exempts buildings built after 12 October 1988. The state’s published fees are a $60 notice and a $180 single-family permit, and the line is 720-507-5136. Paint, solvents and automotive fluids from a Weld County address go free to 1311 North 17th Avenue in Greeley, (970) 400-2217.
More services
Other things we haul
Residential Dumpster Rental
Basements, garages and thirty years of storage out of a house that predates 1980.
Learn more →Commercial Dumpster Rental
Shops, restaurants and contractors inside the limits, where the City is the permit desk.
Learn more →Roofing Dumpster Rental
Counted in squares and layers, because hail is the job this county buys containers for.
Learn more →Roll-Off Dumpster Rental
Ten through forty yard boxes, out of the yard on 14th Avenue every working day.
Learn more →Same-Day Dumpster Rental
Ring before nine and there is usually an afternoon slot still on the board.
Learn more →Junk Removal Dumpsters
Empty a lower level, a garage or a rental unit at whatever pace suits you.
Learn more →Estate Cleanout Dumpsters
Unhurried container work for a family emptying a house somebody lived in for decades.
Learn more →Demolition Debris Removal
Porches, sheds, garages and interior strip-outs, with swaps that keep a crew moving.
Learn more →Concrete & Heavy Debris
Dedicated cans for slab, block, brick and footing spoil, loaded flat and low.
Learn more →Yard Waste & Brush Removal
Green material kept in its own load, because composting here is closer and cheaper.
Learn more →Where we deliver
Construction Dumpster Rental across Weld County and Northern Colorado
Same work, same flat rate, every district and town on this list. Open yours for the placement notes and the jurisdiction answer.
Talk to a real person
Need construction dumpster rental in Greeley?
Describe the load — the room, the roof, the basement, the slab out the back — and you will get the size, the flat number and the day, on the phone, first time of asking. There is nothing on this site to fill in and nothing sitting in an inbox overnight.
Greeley and every one of the seventeen places we run to in Weld County · Mon–Fri 6:30am–5pm, Sat 7am–1pm